Evidence
La Paz County · evidence records supporting the roll
Readiness
Every value the report relies on resolves to a dated artifact whose hash still matches and which the engineer has accepted.
Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.
Engineer-owned changes and basis values are attributable, so a reviewer can ask a person why a number is what it is.
Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.
One condition earlier in the engagement is unmet, and this stage cannot finish until it is resolved. It is on Roll.
Coverage
Where this stands
An artifact is captured from the same county navigation that reads the value, hashed on arrival, and verified against that hash on every later read. Acceptance is a separate, accountable act by the engineer. A captured document is not evidence until it verifies and is accepted.
One project file
juniper-flat-edu-schedule.csv
Accepted
juniper-flat-edu-schedule.csv
Accepted- Evidence type
- Basis import
- SHA-256
- 44c7b59ed9d1c7da068fad3eaa347231daf84fdc624ee846c2aef588a7f5c5e0
- Captured by
- Freeboard demonstration fixture
- Source
- evidence/artifacts/juniper-flat-edu-schedule.csv
- Review outcome
- Accepted
- Reviewed by
- Freeboard demonstration fixture
- Reviewed at
- Jul 29, 2026, 5:00 PM MST
- Review reason
- The EDU schedule matches the design report's demand figures.