Skip to content
How it works

Report

Prospector Point · the engineer's deliverable and what stands between it and generation

Report candidate
None designated
Revisions computed
0

A report is generated from one locked revision, never from the working draft.

Not ready

2 conditions are not met, and 5 cannot be tested until a revision is designated.

Roster and membership reconcile

Every parcel in the dated source roster has a membership decision, and nothing was rejected into the roster. County or recorded-plat reconciliation remains a separate authority check when the source is a client schedule.

Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.

The tax year policy is decided

The resolver policy is recorded as an accountable project decision before valuations are relied on.

The assessment methodology is decided

The named method and its rationale are recorded as an accountable project decision.

The ratio threshold is decided

The threshold used for every assessment-unit test is recorded as an accountable project decision.

A current revision is designated

One computed revision is named as the report candidate and still matches the current assessment truth.

Designate an immutable revision as the report candidate.

The report candidate balances to the cent

Every component and the complete assessment reconcile exactly in the designated revision, with remainders allocated deterministically.

Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.

Every unit in the report candidate has an outcome

No assessment unit in the designated revision is unknown, and every unit below the threshold carries a remedy or an accepted basis.

Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.

Workflow flags are cleared

Every issue raised for the district manager has a recorded resolution before finalization.

Evidence exists, verifies, and is accepted

Every value the report relies on resolves to a dated artifact whose hash still matches and which the engineer has accepted.

Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.

Every judgment has an author and a reason

Engineer-owned changes and basis values are attributable, so a reviewer can ask a person why a number is what it is.

Not tested yet. Nothing is designated as the report candidate, and this tests that revision rather than the one last calculated.

The document template is defined

A complete report establishes the structure to generate, and where signature and seal remain external.

No complete engineer report has been supplied, so the document template and its signature workflow are undefined.

What generation will produce

Report
The engineer's report, from the locked revision
Assessment schedule
Rows copied from revision results, with no arithmetic in the document layer
Revision manifest
The revision's identity, inputs, and reproducible results
Evidence manifest
Every supporting artifact, with its hash and capture time

Signature and seal stay outside the product. Correcting a generated report creates a successor revision and a new bundle rather than replacing one, so nothing that has been issued is silently rewritten.